|
Improve Productivity by Reducing Down-time of Reactor Systems
Improved safety, productivity and reduced downtime by switching to Reactor-Ready
 |
|
Contacts
Lee Ji Sung
------------------------------------------------------------------------ |
| |
Organisation
Yuhan Corporation
------------------------------------------------------------------------ |
| |
Department
Process chemistry
------------------------------------------------------------------------ |
| |
Country
South Korea
------------------------------------------------------------------------ |
| |
Product
Reactor-Ready
------------------------------------------------------------------------ |
| |
Case Study
No. 1022
------------------------------------------------------------------------ |
| |
""""
------------------------------------------------------------------------ |
The situation
Existing, locally-produced jacket reactor systems were difficult to assemble resulting in leaks and breakages.
The objectives
• Improve safety and working practices by reducing leaks
• Enable the use of multiple reactor volumes on a single framewor.
The results
Improved safety, productivity and reduced downtime
<< BACK
|